項(xiàng)目概況
Lvheng Science and Technology won the first prize in the bidding of Paiwei River 3000m < sup > 3 / D Comprehensive Treatment Sewage Treatment Station in Gutai Central District of Fuzhou City. On July 14, 2017, Lvheng Technology provided a complete set of equipment supply, installation and project operation services, and completed the entire project construction within 30 days. The formal operation time is not less than one year.
Paiwei Road is near Minjiang River. The available area of the project is 390m < sup > 2 , and the actual occupancy of equipment and auxiliary rooms is 220m < sup > 2 . The project adopts a GreenEver high-efficiency unpowered sewage purifier with a capacity of 3000m < sup > 3 / d, complete dosing and sludge dewatering equipment. Since the operation of the project, the equipment has been stable and the effluent has been qualified. At present, many batches of inspection by leaders at all levels in cities and districts and visits by relevant business units have been received.
In addition, Fuzhou has more than a dozen projects such as the two branches of Guangming Port, the crossing of the Hengjiang River, the Hongquan River, the Jingang River, the Pushou River and the Taiyu River.
Water quality comparison before and after treatment
Leadership concern
Fuzhou Standing Committee, deputies to the NPC, director of environmental sanitation and leaders of other units visited the scene.